Membrane Cases

Wuhai Coal Mine Gangue Drainage Water Treatment Project

关键词:Sewage treatment equipment,MBR membrane (Membrane Bio-Reactor),Municipal wastewater treatment,Medical wastewater treatment,Laboratory wastewater treatment,Industrial wastewater treatment,Pure water

信息来源:乾元环境    作者:乾元环境   发布日期:2025-04-15 浏览次数:4 次

Project Background:
During coal mining operations, wastewater is generated from underground strata. In 2021, China's coal production reached 4.13 billion tons, yielding approximately 8.2 billion cubic meters of mine drainage water (compared to 104.96 billion m³ of industrial water consumption nationwide). Treating and reusing mine drainage water not only prevents environmental pollution but also mitigates water resource waste.

Project Outcomes:
The project effectively resolved water supply challenges for industrial and domestic use in the industrial park, minimizing mine drainage water waste and maximizing water availability for production needs.

Project Type:‌ New Construction
Commissioning Date:‌ January 2021
Process Flow:‌ Chemical softening + AAO (Anaerobic-Anoxic-Oxic) + MBR (Membrane Bioreactor)
Product Model:‌ OM-MB-36
Sludge Concentration:‌ 10,000–15,000 g/L

Technical Performance

  • Treatment Capacity:‌ 20,000 tons/day

  • Membrane Units:‌ 18 trains, 47,952 m²

  • Average Flow per Unit:‌ 46.3 m³/h

  • Average Flux:‌ 18 LMH

  • Effluent Quality:‌ SDI Turbidity <1, Suspended Solids (SS) <1 mg/L